Showing posts with label excavators maintenance. Show all posts
Showing posts with label excavators maintenance. Show all posts

Monday, July 23, 2018

Repair and maintenance of excavator parts in summer


The summer is coming,how to repair and maintenance of excavator parts?FRB Bearing will be analyzed from the following points:

1.What are the aspects of daily maintenance of excavators?
All yellow nozzles and slewing bearings shall be covered with butter once every 10 days and 15 days, and butter shall be beaten twice every 4-8 hours at different angles. Each reducer shall be replaced within 520 hours after the first operation, and 2-3 times in the following year. The engine must be preheated for 10-15 minutes before operation.

YRTS200 Rotary Table Bearing

Product Model: YRTS200 d:200mm D:300mm H:45mm weight:9.7kg YRTS200 bearing consists of thrust/radial housing washer,a thrust/radial...